News24 Traffic Reports
Last Updated: 4/7/2005 7:00:00 PM - (SA)
Welcome to News24's Traffic Reports section. Here you will find details of traffic in the major centres of Gauteng, KwaZulul-Natal and the Western Cape. Reports are updated daily, at peak hour times, between 6:00 and 9:00, and again between 15:30 and 18:30
EASTERN CAPE |
Location |
EAST LONDON |
Road name |
N6: BOTH WAYS |
Report |
TWO SETS OF ROADWORKS BETWEEN EAST LONDON AND STUTTERHEIM - EXPECT DELAYS AT ALL TIMES. |
Severity |
Level 4 |
|
EASTERN CAPE |
Location |
GRAAFF-REINET |
Road name |
N9: BOTH WAYS |
Report |
ROADWORKS AT VARIOUS LOCATIONS BETWEEN GRAAFF-REINET AND MIDDELBURG UNTIL JUNE 2005. |
Severity |
Level 4 |
|
EASTERN CAPE |
Location |
PORT ELIZABETH |
Road name |
N2: BOTH WAYS |
Report |
ROADWORKS WITH LANE RESTRICTIONS ON THE ON AND OFF RAMPS AT THE KEMPSTON INTERCHANGE - EXPECT HEAVY DELAYS. |
Severity |
Level 3 |
|
EASTERN CAPE |
Location |
BUTTERWORTH |
Road name |
N2: BOTH WAYS |
Report |
TWO SEPARATE SETS OF ROADWORKS EITHER SIDE OF BUTTERWORTH WILL CAUSE DELAYS BETWEEN EAST LONDON AND UMTATA. |
Severity |
Level 3 |
|
EASTERN CAPE |
Location |
KING WILLIAMS TOWN |
Road name |
N2: BOTH WAYS |
Report |
ROADWORKS WITH SPEED LIMITS AND NARROWING OF CARRIAGEWAY EITHER SIDE OF KING WILLIAMS TOWN. |
Severity |
Level 3 |
|
FREE STATE |
Location |
WARDEN |
Road name |
N3: BOTH WAYS |
Report |
ROADWORKS BETWEEN WARDEN AND HARRISMITH. |
Severity |
Level 3 |
|
KWAZULU NATAL |
Location |
TUGELA |
Road name |
N3: BOTH WAYS |
Report |
ROADWORKS BETWEEN TUGELA AND VAN REENENS PASS. |
Severity |
Level 3 |
|
KWAZULU NATAL |
Location |
LADYSMITH |
Road name |
N11: BOTH WAYS |
Report |
ROADWORKS BETWEEN LADYSMITH AND NEWCASTLE WITH TEMPORARY TRAFFIC LIGHTS IN OPERATION. |
Severity |
Level 3 |
|
WESTERN CAPE |
Location |
GARDEN ROUTE |
Road name |
N2: BOTH WAYS |
Report |
ROADWORKS WITH LANE RESTRICTIONS BETWEEN GEORGE AND WILDERNESS - THE FULL ROAD CLOSURE AT KAAIMANS PASS HAS BEEN SUSPENDED UNTIL 12TH APRIL. |
Severity |
Level 5 |
|
WESTERN CAPE |
Location |
PAROW |
Road name |
N1: INBOUND |
Report |
LANE CLOSURE FOR ROADWORKS AT THE MONTE VISTA EXIT - EXPECT DELAYS FROM THE PLATTEKLOOF ROAD EXIT. |
Severity |
Level 4 |
|
WESTERN CAPE |
Location |
MALMESBURY |
Road name |
N7: BOTH WAYS |
Report |
OFF-PEAK ROADWORKS WITH STOP GO BOARDS IN OPERATION BETWEEN 0800 AND 1700 UNTIL END OF MAY. |
Severity |
Level 3 |
|
Reports are updated between 6:00 and 9:00, and again between 15:30 and 18:30.
|