Bid Results by Letting Date
Letting Date |
Contract Number |
Description |
February 13, 2008 |
TANY 08-17A/D213697 |
Rehabilitation of the Wastewater Treatment Plant at the Stormville Service Area I-84 Milepost 55.57 Westbound in the New York Division of the New York State Thruway in Dutchess County |
January 30, 2008 |
TANE 08-19B/D213705 |
Construction of the North Avenue Utility/Pedestrian Bridge at Milepost NE 5.76 in the New York Division of the New York State Thruway in Westchester County |
January 9, 2008 |
TAB 07-60/D213751 |
Toll Plaza and Ramp Pavement Rehabilitation to Interchange 47 – Rochester – Leroy – I-490 at Milepost 378.56 in the Buffalo Division of the New York State Thruway in Genesee County |
December 19, 2007 |
TANY 07-18AR/D213467 |
Water Storage Tank Replacement at the Plattekill Service Area Milepost 65 Northbound in the New York Division of the New York State Thruway in Orange County |
December 19, 2007 |
TANY 07-59/D213735 |
Reconstruction of the Woodbury Toll Barrier Between Milepost 40.6± and Milepost 51.1± in the New York Division of the New York State Thruway in Orange County |
December 12, 2007 |
TAN 07-52B/D213701
ALL BIDS REJECTED
|
Panelized Deck Replacement of the South Grand Island Bridge (NB) and Substructure Repairs to South Grand Island Bridge (NB and SB) at Milepost N14.35 to Milepost N14.99 in the Buffalo Division of the New York State Thruway in Erie County |
December 12, 2007 |
TAS 07-35A/D213707 |
Installation of a Fire Alarm System at the Tarbell Road Complex Interchange 35, Milepost 279.93 in the Syracuse Division of the New York State Thruway in Onondaga County |
December 12, 2007 |
TAS 07-36A/D213708 |
HVAC Upgrades to Building M3341 at the Tarbell Road Complex Interchange 35, Milepost 279.93 in the Syracuse Division of the New York State Thruway in Onondaga County |
November 28, 2007 |
TAB 07-49/D213730 |
Installation of Epoxy and Other Pavement Markings at Various Locations in the Buffalo Division of the New York State Thruway in Ontario, Monroe, Genesee, Erie, Chautauqua and Niagara Counties |
November 28, 2007 |
TAS 07-48/D213729 |
Installation of Epoxy and Other Pavement Markings at Various Locations in the Syracuse Division of the New York State Thruway in Montgomery, Herkimer, Oneida, Madison, Onondaga, Cayuga, Seneca and Ontario Counties |
November 28, 2007 |
TAS 07-55C/D213742 |
Herkimer County Bank Repairs at Erie Canal Milepost E-240.00 in the Syracuse Division of the New York State Thruway in Herkimer County |
November 14, 2007 |
TAA 07-17A/D213671 |
Roofing Replacements at the Malden Service Area Building Number S2102, Milepost 103.30±, Northbound and New Baltimore Service Area Building Numbers S2103 and S2140, Milepost 127.00±, North/Southbound in the Albany Division of the New York State Thruway in Ulster and Greene Counties |
November 7, 2007 |
TAA 07-47/D213728 |
Installation of Epoxy and Other Pavement Markings at Various Locations in the Albany Division of the New York State Thruway in Ulster, Greene, Albany, Schenectady, Montgomery, Rensselaer and Columbia Counties |
November 7, 2007 |
TANY 07-46/D213727 |
Installation of Epoxy and Other Pavement Markings at Various Locations in the New York Division of the New York State Thruway in Bronx, Westchester, Rockland, Orange, Ulster, Dutchess and Putnam Counties |
November 7, 2007 |
TAS 07-58C/D213752 |
Fabrication and Delivery of Steel Dredge Pipe Pontoons in the Syracuse Division of the New York State Thruway in Onondaga County |
October 31, 2007 |
TABS 07-56B/D213238 |
Replacement of Route 980D Bridge Over Thruway at Milepost B24.09 in the Albany Division of the New York State Thruway in Columbia County |
October 10, 2007 |
TAS 07-54B/D213401 |
Bridge Replacement of Buckley Road Bridge Over the Thruway at Milepost 283.04 in the Syracuse Division of the New York State Thruway in Onondaga County |
October 3, 2007 |
TAN 07-53B/D213699 |
Maintenance Washing of the North Grand Island Bridges on the Niagara Section at Milepost N20.35, Milepost N21.11 and Milepost N21.12 in the Buffalo Division of the New York State Thruway in Erie and Niagara Counties |
September 12, 2007 |
TANY 07-43/D213721 |
Expansion of the New Paltz Park and Ride Lot at Milepost 76.3 in the New York Division of the New York State Thruway in Ulster County |
September 5, 2007 |
TAA 07-44/D213510 |
Expansion of Truck Parking and Miscellaneous Work at Ulster Service Area at Milepost 96 Southbound in the Albany Division of the New York State Thruway in Ulster County |
August 8, 2007 |
TANY 07-38/D213712
ALL BIDS REJECTED
|
Pavement Repairs, Pavement Milling and Resurfacing Between Milepost 38.7± and Milepost 43.5± in the New York Division of the New York State Thruway in Orange County |
August 8, 2007 |
TAS 07-28/D213694 |
1R Mill and Inlay with Safety Improvements and Miscellaneous Work Between Milepost 210.0± and Milepost 220.0± in the Syracuse Division of the New York State Thruway in Herkimer County |
July 25, 2007 |
TAA 07-50A/D213733 |
The Provision of a New A-C System and Associated Work for the Computer Room at 337 Southern Boulevard Building #A2053 Interchange No. 23, Milepost 141.9 in the Albany Division of the New York State Thruway in Albany County |
July 25, 2007 |
TANY 07-32/D213686 |
Full Depth Pavement Repairs, Asphalt Pavement Overlay and Milling and Resurfacing on I-87 from Milepost 46.0 (46.4 SB) and Milepost 60.5 Northbound and Southbound in the New York Division of the New York State Thruway in Orange County |
July 11, 2007 |
TAA 07-30B/D213700 |
Steel Repairs to Damaged and Deteriorated Bridges at Various Locations in the Albany Division in the New York State Thruway in Various Counties |
June 27, 2007 |
TAA 07-9C/D213667 |
Site Work Repairs at Lock E-9, Milepost E-183.02, Lock E-13, Milepost E-207.48, Lock E-14, Milepost E-215.38, Lock E-15, Milepost E-218.73 in the Albany Division of the New York State Thruway in Montgomery and Schenectady Counties |
June 27, 2007 |
TAA 07-39C/D213713
ALL BIDS REJECTED
|
Fabrication and Delivery of Steel Dredge Pipe and Dredge Pipe Pontoons in the Albany, Syracuse and Buffalo Divisions of the New York State Thruway in Saratoga, Oneida, Onondaga and Orleans Counties |
June 27, 2007 |
TAS 07-40/D213714 |
Pavement Milling and Resurfacing on I-90 EB and WB Between Milepost 268.0± and Milepost 279.3± Including Resurfacing of Interchange 35 Ramps and Toll Plaza in the Syracuse Division of the New York State Thruway in Madison and Onondaga Counties |
June 27, 2007 |
TAS 07-41B/D213719 |
Steel Repairs to Damaged and Deteriorated Bridges at Various Locations in the Syracuse Division of the New York State Thruway in Various Counties |
June 27, 2007 |
TAB 07-42B, D213720 |
Steel Repairs to Damaged and Deteriorated Bridges at Various Locations in the Buffalo Division of the New York State Thruway in Various Counties |
June 20, 2007 |
TAS 07-37, D213709 |
Mill and Inlay Between Milepost 320.7 and Milepost 327.54 in the Syracuse Division of the New York State Thruway in Seneca and Ontario Counties |
May 9, 2007 |
TAA 07-13, D213672 |
Pavement Repairs and Resurfacing with Safety Upgrades from Milepost 146.0 to Milepost 163.3 in the Albany Division of the New York State Thruway in Albany and Schenectady Counties |
May 2, 2007
|
TAA 07-24A, D213682
ALL BIDS REJECTED
|
Construction of Ethanol E85 Fueling Facilities at the Guilderland and New Baltimore SB Service Areas in the Albany Division of the New York State Thruway in Albany and Greene Counties |
May 2, 2007 |
TAB 07-26A, D213684
ALL BIDS REJECTED
|
Construction of Ethanol E85 Fueling Facilities at the Seneca and Pembroke Service Areas in the Syracuse and Buffalo Divisions of the New York State Thruway in Ontario and Genesee Counties |
May 2, 2007 |
TANY 07-23A, D213681
|
Construction of Ethanol E85 Fueling Facilities at the Modena Service Area in the New York Division of the New York State Thruway in Orange County |
May 2, 2007 |
TAS 07-25A, D213683
ALL BIDS REJECTED
|
Construction of Ethanol E85 Fueling Facilities at the Chittenango and Dewitt Service Areas in the Syracuse Division of the New York State Thruway in Madison and Onondaga Counties |
April 25, 2007 |
TAA 07-8C/D213666 |
Concrete and Steel Repairs at Locks E-8 to E-15 on the Erie Canal in the Albany Division of the New York State Thruway in Schenectady and Montgomery Counties |
April 25, 2007 |
TAN 07-27/D213690 |
Removal of City Line Toll Barrier and Black Rock Toll Barrier at Milepost N0.53 and Milepost N8.00 in the Buffalo Division of the New York State Thruway in Erie County |
April 18, 2007 |
TAN 07-11B/D213642 |
Sidewalk Rehabilitation and Curb Repairs of the South Grand Island Bridges Southbound at Milepost N14.35 to Milepost N14.99 in the Buffalo Division of the New York State Thruway in Erie County |
April 11, 2007 |
TANY 07-21B/D213680 |
Painting of Two Bridges at Milepost 1.77 and Milepost 2.20 in the New York Division of the New York State Thruway in Westchester County |
April 4, 2007 |
TAA 07-22A/D213673 |
Provide Labor and Materials for Salt Building Rehabilitations and Roofing Replacements at Kingston, Catskill, and Berkshire Sections in the Albany Division of the New York State Thruway in Ulster, Greene, and Rensselaer Counties |
March 28, 2007 |
TAB 07-2/D213511 |
Expansion of Truck Parking and Miscellaneous Work at Clarence Service Area at Milepost 412 Westbound in the Buffalo Division of the New York State Thruway in Erie County |
March 21, 2007 |
TAA 07-20C/D213616 |
Rehabilitation of Movable Dam 10 at Lock E-14 at Erie Canal Milepost E-215.38 in the Albany Division of the New York State Thruway in Montgomery County |
March 14, 2007 |
TAA 07-15B/D213653 |
Installation of Protective Screening on Nine Bridges in the Albany Division of the New York State Thruway in Ulster, Greene, Montgomery, Rensselaer and Columbia Counties |
March 14, 2007 |
TANY 07-18A, D213467
ALL BIDS REJECTED
|
Water Storage Tank Upgrades at the Plattekill Service Area Milepost 65 Northbound in the New York Division of the New York State Thruway in Orange County |
March 14, 2007 |
TAS 07-16/D213658 |
Mill and Inlay with Selective Full Depth Repairs at Various Locations in the Syracuse Division of the New York State Thruway in Madison, Onondaga, Cayuga, and Seneca Counties |
February 21, 2007 |
TAA 07-12A, D213649 |
Roofing Replacement at the New Baltimore Service Area Building Number S2103, Milepost 127.00± Northbound and Southbound in the Albany Division of the New York State Thruway in Greene County |
February 21, 2007 |
TAB 07-5/D213661 |
Selective Mill and Inlay at Various Locations in the Buffalo Division of the New York State Thruway in Genesee and Erie Counties |
February 14, 2007 |
TAGS 07-3B/D213305 |
Rehabilitation of the Scotland Hill Road Bridge Over the Garden State Parkway at Milepost GS 0.38 in the New York Division of the New York State Thruway in Rockland County |
February 7, 2007 |
TANY 07-6B/D213652 |
Rehabilitation of the Union Avenue Bridge Over the New York State Thruway at Milepost 63.16 in the New York Division of the New York State Thruway in Orange County |
January 31, 2007 |
TAA 07-7C/D213664 |
Electrical Rehabilitation of Locks E-12 and E-13 on the Erie Canal in the Albany Division of the New York State Thruway in Montgomery County |
January 24, 2007 |
TAB 07-19C/D213689 |
Canal Bank Restoration at Milepost 457.70 on the Erie Canal in the Village of Medina in the Buffalo Division of the New York State Thruway in Orleans County |
January 17, 2007 |
TANY 07-1/D213278 |
Rock Remediation and Rock Draping at Milepost 32.42± Northbound and Milepost 18.3± Southbound in the New York Division of the New York State Thruway in Rockland County |
January 10, 2007 |
TANE 07-14B/D213396
ALL BIDS REJECTED
|
Maintenance Bridge Washing on the New England Portion of the Thruway (I-95) Including 50 Thruway Bridges from Milepost NE 0.23 and Milepost NE 14.93 in the New York Division of the New York State Thruway in Bronx and Westchester Counties |